The decision to delay the launch was taken after a risk analysis that highlighted the potential mass destruction, with an area of 68 barrels of lead azide extending up to 100 miles away. The modeling requires that the lead plume, a toxic gas and lead, can reach a vast area, making the situation extremely dangerous.

The decision to delay the launch was made in response to an emergency order, which imposed the suspension of two controlled detonations, designed to destroy the barrels where they are located. These structures, located in earth-covered magazines (ECM), are a focal point for the dispersion of toxic gas and lead.

Prior to the court's decision, the army moved the explosion until November 23, to provide time for communication with Iowans, who suffered total ignorance of detonations. Lead azide, in a mixture of water and ethanol, has degraded and crystallized over time, making the risk of an explosion even higher.

The army has determined that the current state is a condition of catastrophic risk, considering that any physical impact or loading, transport or burial of barrels for safer detonation would create an unacceptable risk of safety and a high probability of accidental and fatal detonation. The risk assessment, issued on Wednesday, excluded any attempt at chemical neutralization, given the complexity and risk of a prolonged process.

The army wrote that the process of chemical neutralization requires much more time and physical manipulation of drums by staff during an extended period of 7-22 days, dramatically increasing the probability of accidental and fatal detonation during manipulation, making the army's plan to clearly communicate with the public about plans, including an open-house event on October 15.

While Middletown's inhabitants might have been aware of the detonations, the Iowans on the planned path of the plume were surprised by this week's news. In its environmental risk assessment, the army stated that it wanted to mitigate lead spills with the rapid excavation of soil and dust and to treat it with a stabilisation agent, to prevent it from remaining in the environment of the military facility, from which it could flow or enter the groundwater.